Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
72:reports_predefined [2018/10/29 16:16] – created emr72:reports_predefined [2024/10/07 20:36] (current) Meier, Erich
Line 1: Line 1:
 ====== Pre-Defined Standard Reports ====== ====== Pre-Defined Standard Reports ======
  
-The following reports have been created by Method Park and should be pre-installed at your Stages installation.+The following reports have been created by the Stages team and should be pre-installed at your Stages installation.
  
-^Report Name^Description^Download| +^ Report Name ^ Description ^ Download ^ 
-|Process Version Usage|The report shows either "What is being used" (all versions of the currently integrated process modules) or "Who is using me" (all process modules where the current module is being integrated in).|ProcessVersionUse.rptdesign|+| Process Version Usage | The report shows either a full tree of "What is being used" (all versions of the currently integrated process modules) or a full tree of "Who is using me" (all process modules where the current module is being integrated in). | {{:72:processversionuse.rptdesign|ProcessVersionUse.rptdesign}} |
  
 If your Stages installation does not have these reports pre-installed, read [[:72:reports_create|here]] how to install these reports. If your Stages installation does not have these reports pre-installed, read [[:72:reports_create|here]] how to install these reports.