Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
72:reports_predefined [2018/11/01 13:42] emr72:reports_predefined [2024/10/07 20:36] (current) Meier, Erich
Line 1: Line 1:
 ====== Pre-Defined Standard Reports ====== ====== Pre-Defined Standard Reports ======
  
-The following reports have been created by Method Park and should be pre-installed at your Stages installation.+The following reports have been created by the Stages team and should be pre-installed at your Stages installation.
  
-^Report Name^Description^Download| +^ Report Name ^ Description ^ Download ^ 
-|Process Version Usage|The report shows either a full tree of "What is being used" (all versions of the currently integrated process modules) or a full tree of "Who is using me" (all process modules where the current module is being integrated in).|ProcessVersionUse.rptdesign|+| Process Version Usage | The report shows either a full tree of "What is being used" (all versions of the currently integrated process modules) or a full tree of "Who is using me" (all process modules where the current module is being integrated in). | {{:72:processversionuse.rptdesign|ProcessVersionUse.rptdesign}} |
  
 If your Stages installation does not have these reports pre-installed, read [[:72:reports_create|here]] how to install these reports. If your Stages installation does not have these reports pre-installed, read [[:72:reports_create|here]] how to install these reports.