This is an old revision of the document!


Import New Reports

Stages supports metrics and reports by integrating the BIRT system. Typically these reports are designed and sent by the Method Park team. However, if desired there is also report training available.

Create Report element

To upload a new report navigate to Reports.

To add a new report element, you can either click on ‘Add Report’ or the + symbol.

Upload Report Design File

Click on the new Report element. Either the ADD button is pressed and a new rptdesign-file can be uploaded or the drag and drop feature can be used.