Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
73:compliance [2019/04/02 17:58] emr73:compliance [2019/04/04 10:07] emr
Line 44: Line 44:
 ===== View Compliance in Process Context ===== ===== View Compliance in Process Context =====
  
-Some process participants need to to understand why a certain activity or work product is required. This can be accomplished by using the ''Compliance''  perspective when viewing the process content.+Some process participants need to understand why a certain activity or work product is required. This can be accomplished by using the ''Compliance''  perspective when viewing the process content.
  
 {{  :73:compliance-viewmappings.png?direct&801x393  }} {{  :73:compliance-viewmappings.png?direct&801x393  }}
Line 70: Line 70:
 ===== Generate Evidence ===== ===== Generate Evidence =====
  
-To generate the evidence for audits, assessments, or appraisals, the same report can be used. Simply run the report in the workspace containing the project's valid process. If a compliance requirement is mapped to a work product with files, those are included in the ''EvidenceURLs''  column and can be opened directly.+To generate the evidence for audits, assessments, or appraisals, the same report can be used. Simply run the report in the workspace containing the project's valid process. If a compliance requirement is mapped to a work product with files, those are included in the ''Evidence'' column.
  
 The report results can be imported into common appraisal tools like //Appraisal Wizard//  and //Capability Advisor//, so auditors can start their assessment right away. The report results can be imported into common appraisal tools like //Appraisal Wizard//  and //Capability Advisor//, so auditors can start their assessment right away.