Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revisionBoth sides next revision
73:compliance [2019/04/03 05:46] – [View Compliance in Process Context] sahr73:compliance [2019/04/04 10:07] emr
Line 44: Line 44:
 ===== View Compliance in Process Context ===== ===== View Compliance in Process Context =====
  
-Some process participants need to understand why a certain activity or work product is required. This can be accomplished by using the ''Compliance'' perspective when viewing the process content.+Some process participants need to understand why a certain activity or work product is required. This can be accomplished by using the ''Compliance''  perspective when viewing the process content.
  
 {{  :73:compliance-viewmappings.png?direct&801x393  }} {{  :73:compliance-viewmappings.png?direct&801x393  }}
  
 This perspective is configurable, but normally shows the description of the process element and its compliance mappings side-by-side. The users can follow the links to the respective compliance requirements, ideally by opening the link in a new browser tab or window. This perspective is configurable, but normally shows the description of the process element and its compliance mappings side-by-side. The users can follow the links to the respective compliance requirements, ideally by opening the link in a new browser tab or window.
- 
  
 ===== Show Compliance Traceability ===== ===== Show Compliance Traceability =====
Line 71: Line 70:
 ===== Generate Evidence ===== ===== Generate Evidence =====
  
-To generate the evidence for audits, assessments, or appraisals, the same report can be used. Simply run the report in the workspace containing the project's valid process. If a compliance requirement is mapped to a work product with files, those are included in the ''EvidenceURLs''  column and can be opened directly.+To generate the evidence for audits, assessments, or appraisals, the same report can be used. Simply run the report in the workspace containing the project's valid process. If a compliance requirement is mapped to a work product with files, those are included in the ''Evidence'' column.
  
 The report results can be imported into common appraisal tools like //Appraisal Wizard//  and //Capability Advisor//, so auditors can start their assessment right away. The report results can be imported into common appraisal tools like //Appraisal Wizard//  and //Capability Advisor//, so auditors can start their assessment right away.