Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
75:releasenotes [2020/05/21 16:11] emr75:releasenotes [2024/02/15 00:00] (current) – external edit 127.0.0.1
Line 38: Line 38:
  
 To provide more insight into the process models several visualizations were enhanced. To provide more insight into the process models several visualizations were enhanced.
 +
 +[[https://doc.stagesasaservice.com/lib/exe/fetch.php?tok=3ad5d7&media=https://doc.stagesasaservice.com/lib/plugins/ckgedit/fckeditor/userfiles/image/75/statechart.png|{{  https://doc.stagesasaservice.com/lib/plugins/ckgedit/fckeditor/userfiles/image/75/statechart.png?direct&800x239  }}]]
  
 A new States diagram for work products shows a state chart which contains all states of a work products, the activities performing the state transitions, and the responsible roles for those activities. A new States diagram for work products shows a state chart which contains all states of a work products, the activities performing the state transitions, and the responsible roles for those activities.
  
-[[https://doc.stagesasaservice.com/lib/exe/fetch.php?tok=3ad5d7&media=https://doc.stagesasaservice.com/lib/plugins/ckgedit/fckeditor/userfiles/image/75/statechart.png|{{  https://doc.stagesasaservice.com/lib/plugins/ckgedit/fckeditor/userfiles/image/75/statechart.png?direct&800x239  }}]]+[[https://doc.stagesasaservice.com/lib/exe/fetch.php?tok=be90bf&media=https://doc.stagesasaservice.com/lib/plugins/ckgedit/fckeditor/userfiles/image/75/sipocwroles.png|{{  https://doc.stagesasaservice.com/lib/plugins/ckgedit/fckeditor/userfiles/image/75/sipocwroles.png?direct&700x352  }}]] 
 + 
 +The SIPOC table diagram has been enhanced with a new switch that shows all involved roles for each activity. All roles are marked with (R), (S), etc., to show the type of involvement in RASIC style.
  
-A new "Phases" switch in the role visualization can be used to layout the activities by phase, which provides more insight into the timing perspective.+A new "Phases" switch in the role visualization can be used to layout the activities by phase, which provides more insight into the timing perspective of each role.
  
-The activities in the workflow grid diagram can now also be grouped by responsible role via the new "Grouping" switch.+Finally, the activities in the workflow grid diagram can now also be grouped by responsible role via the new "Grouping" switch.
  
 ===== Support for Multiple Organizations on one Instance ===== ===== Support for Multiple Organizations on one Instance =====
Line 94: Line 98:
  
   * PTC Integrity Lifecycle Manager   * PTC Integrity Lifecycle Manager
-  * IBM Rational Team Concert+  * IBM Engineering Lifecycle Management (formerly know as Rational Team Concert)
   * Jira Cloud   * Jira Cloud
   * Redmine   * Redmine
Line 159: Line 163:
 [[:75:mandatory_manual_upgrade_steps_for_version_75|See here]] for full details. [[:75:mandatory_manual_upgrade_steps_for_version_75|See here]] for full details.
  
-Also, if you have customized readiness checks (a.k.a. validators) in your metamodel, those might need to be recompiled for 7.5.+Also, if you have customized readiness checks (a.k.a. validators) in your metamodel, those might need to be recompiled for 7.5. If you use the Unified Configuration metamodel ask your product consultant for the newest version.
  
 ===== Notes ===== ===== Notes =====
  
-For topics marked with <font 24px/inherit;;inherit;;inherit>*</font>: please contact your product consultant or the customer care team for more info on how to integrate those enhancements into your configuration.+For topics marked with *: please contact your product consultant or the customer care team for more info on how to integrate those enhancements into your configuration.