Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revisionBoth sides next revision
75:workwithfiles [2020/09/09 17:16] – [Using Refresh to sync with CM] aakr75:workwithfiles [2020/09/09 17:24] – [Using Refresh to sync with CM] aakr
Line 70: Line 70:
 ===== Using Refresh to sync with CM ===== ===== Using Refresh to sync with CM =====
  
-When a user is working on a work product+When a user is working with a work product in Stages which has the file which is simultaneoulsy been updated in the CM system, ''Refresh'' can be used to access and update this latest information in Stages. 
 + 
 +{{  https://doc.stagesasaservice.com/lib/plugins/ckgedit/fckeditor/userfiles/image/75/refresh.png?direct&900x455  }}