Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Last revisionBoth sides next revision
72:import [2018/06/18 15:36] – [Import processes] bkkr72:import [2018/06/29 19:00] – [Import processes] bkkr
Line 4: Line 4:
  
 Importing processes is important if you wish to switch from an old to a current version of a process descroption when carrying out a project update. When importing a process description into an existing project, the logical file structures as well as the role assignments of the imported process description are taken over, assuming that the existing project contains the relevant documents and roles. Importing processes is important if you wish to switch from an old to a current version of a process descroption when carrying out a project update. When importing a process description into an existing project, the logical file structures as well as the role assignments of the imported process description are taken over, assuming that the existing project contains the relevant documents and roles.
 +
 +Importing processes is also important when you want the same process in multiple projects.
  
 TBD TBD
 +
 +Next steps:
 +
 +need to speak of how to do it