Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Last revisionBoth sides next revision
72:tailoring [2018/06/25 13:15] – [Manage tailoring] bkkr72:tailoring [2018/06/25 18:37] – [Manage tailoring] bkkr
Line 4: Line 4:
  
 (not in the software yet, for now, just talk about it and give background) (not in the software yet, for now, just talk about it and give background)
- 
-We use tailoring to incorporate requirements of project- or program-specific instances in a process. 
  
 === Tailoring === === Tailoring ===
  
-There is no "Ultimate" process that all processes can follow successfully. All of the processes follow the same [[:general:metamodel|]], but they have small variations. Tailoring a process filters out the process activities, work products, roles, etcfor a specific project. For example, "Safety Manager" role will have different work products based on the level of safety integrity needed, so the information for all other levels is not relevant for a specific project. Tailoring this process allows the safety manager to only see the components that are applicable to the specific project. +We use tailoring to incorporate requirements of project- or program-specific instances in a process. The specific requirements are tailored in/out of process depending on the specifications of that process. The user viewing the tailored process will only see the relevant information for their project, not the tailored out information.
- +
-TBD+
  
 Project- or program-specific processes can be created through module inheritance. Specific requirements of the specific processes can be incorporated by a tailoring mechanism. Project- or program-specific processes can be created through module inheritance. Specific requirements of the specific processes can be incorporated by a tailoring mechanism.
  
-^^ need to put this in there+TBD