Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
73:compliance [2019/04/04 10:07] emr73:compliance [2019/04/10 17:48] emr
Line 1: Line 1:
 ====== Manage Compliance ====== ====== Manage Compliance ======
  
-Development of complex products is always a regulated environment. Examples are standards set by governing bodies like the FAA or FDA, ISO or IEEE standards, quality, safety, security, environmental, or health standards, or market requirements like CMMI or Automotive SPICE. Assuring compliance with all relevant standards is a key aspect of process management.+Development of complex products is always a regulated environment. Examples are standards set by governing bodies like the FAA or FDA, ISO or IEEE standards, quality, safety, security, environmental, or health standards, or market requirements like Automotive SPICE or CMMI. Assuring compliance with all relevant standards is a key aspect of process management.
  
 Stages enables process managers to map their processes against standards, detect and close gaps, and generate evidence for audits, assessments, and appraisals. Stages enables process managers to map their processes against standards, detect and close gaps, and generate evidence for audits, assessments, and appraisals.
Line 38: Line 38:
 To finish the mapping, use the X in the top right corner that shows both the reference model name and the name of the workspace where the process resides. To finish the mapping, use the X in the top right corner that shows both the reference model name and the name of the workspace where the process resides.
  
-{{ youtube>j5qlrl1jCUk?large }}+{{ youtube>j5qlrl1jCUk?large&rel=0 }}
  
 The above video shows the whole sequence of actions to assign reference model scopes, map the process to the individual requirements, and finally rate the mappings. The above video shows the whole sequence of actions to assign reference model scopes, map the process to the individual requirements, and finally rate the mappings.
Line 70: Line 70:
 ===== Generate Evidence ===== ===== Generate Evidence =====
  
-To generate the evidence for audits, assessments, or appraisals, the same report can be used. Simply run the report in the workspace containing the project's valid process. If a compliance requirement is mapped to a work product with files, those are included in the ''Evidence'' column.+To generate the evidence for audits, assessments, or appraisals, the same report can be used. Simply run the report in the workspace containing the project's valid process. If a compliance requirement is mapped to a work product with files, those are included in the ''Evidence''  column.
  
 The report results can be imported into common appraisal tools like //Appraisal Wizard//  and //Capability Advisor//, so auditors can start their assessment right away. The report results can be imported into common appraisal tools like //Appraisal Wizard//  and //Capability Advisor//, so auditors can start their assessment right away.