Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Last revisionBoth sides next revision
general:metamodel [2019/04/22 19:17] emrgeneral:metamodel [2019/04/22 19:23] emr
Line 1: Line 1:
 ====== Metamodel ====== ====== Metamodel ======
  
-The **Metamodel** defines which process elements exist within [[:general:process|]] and how they are associated with each other.+The **Metamodel** defines how processes are captured within Stages. It defines which [[:general:process|process elements]] exist within a process, how they are associated with each other and how each element type is visualized to the users.
  
 Metamodels are configured on the server by the Stages administrators. Metamodels are configured on the server by the Stages administrators.
Line 9: Line 9:
 {{  :general:metamodel.png?direct&600x276  }} {{  :general:metamodel.png?direct&600x276  }}
  
-Customer specific metamodels can be configured, typically in collaboration with Method Park consultants.+Derivatives of this metamodel or completely customer-specific metamodels can be configured, typically in collaboration with Method Park consultants
 + 
 +[[:72:understand|See here how metamodels are being used]] to navigate and understand processes in Stages.
  
 Stages can support multiple metamodels at the same time. Each workspace and every process version within each workspace can have a different metamodel. Stages can support multiple metamodels at the same time. Each workspace and every process version within each workspace can have a different metamodel.