Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
reports:change-history [2025/11/20 19:04] – [Project Plan Export] Fryer, Kathrynreports:change-history [2025/11/26 15:12] (current) – [Unresolved Process Interfaces] Fryer, Kathryn
Line 5: Line 5:
 ===== Association Overview ===== ===== Association Overview =====
  
-  * 2025-07-01 - Completely redesigned to use tables. Enabled HTML and PDF output as well as Excel. Eliminated limit on number of elements. Included details on target element workspace. In Excel, included element and workspace path information(RC-213) Requires Stages 7.11.5 and later. +  * 2025-11-06 (Build 6179) - Add handling for Topic element type (RC-443); internal API update (RC-424). Requires Stages V7.11.8 or later. 
-  * 2024-10-04 - Minor updates to date/build tracking  +  * 2025-07-01 (Build 5672)- Completely redesigned to use tables. Enabled HTML and PDF output as well as Excel. Eliminated limit on number of elements. Included details on target element workspace. In Excel, included element and workspace path information (RC-213)Requires Stages V7.11.5 or later. 
-  * 2023-12-13 - Code optimization+ 
 +Changes to earlier version of the report: 
 + 
 +  * 2024-10-04 - Minor updates to date/build tracking 
 +  * 2023-12-13 - Code optimization.
   * 2023-08-03 - Limited number of elements to 100 to avoid performance issues (RC-176). Improved documentation, error messages, formatting (RC-137). Renamed report from AllAssociationsForElementType.   * 2023-08-03 - Limited number of elements to 100 to avoid performance issues (RC-176). Improved documentation, error messages, formatting (RC-137). Renamed report from AllAssociationsForElementType.
   * 2022-09-23 - Added support for Work Product States (RC-101).   * 2022-09-23 - Added support for Work Product States (RC-101).
  
 Find current report details [[reports:start#association-overview|here]]. Find current report details [[reports:start#association-overview|here]].
- 
  
 ===== Comments Analysis ===== ===== Comments Analysis =====
Line 22: Line 25:
  
 Find current report details [[reports:start#comments-analysis|here]]. Find current report details [[reports:start#comments-analysis|here]].
- 
  
 ===== Compliance Overview ===== ===== Compliance Overview =====
Line 34: Line 36:
  
 Find current report details [[reports:start#compliance-overview|here]]. Find current report details [[reports:start#compliance-overview|here]].
- 
  
 ===== Compliance Traces - Process Perspective ===== ===== Compliance Traces - Process Perspective =====
  
-  * 2025-09-12 (Build6008) - Internal updates to handle legacy element types (RC-369); added element paths to Excel output for filtering (RC-367).  +  * 2025-11-10 (Build 6195) - Internal update to API (RC-437). Requires Stages V7.11.8 or later. 
-  * 2024-10-28 (Build5094)- Show Note when rating is "Not Covered" (RC-301). +  * 2025-09-12 (Build 6008) - Internal updates to handle legacy element types (RC-369); added element paths to Excel output for filtering (RC-367).  
 +  * 2024-10-28 (Build 5094)- Show Note when rating is "Not Covered" (RC-301). 
   * 2024-10-04 - Made Reference Model parameter selection mandatory. Fixed issue where PDF truncated data. Fixed error for no-process workspaces (RC-272). Minor updates to date/build tracking.   * 2024-10-04 - Made Reference Model parameter selection mandatory. Fixed issue where PDF truncated data. Fixed error for no-process workspaces (RC-272). Minor updates to date/build tracking.
   * 2023-11-24 - Updated documentation.   * 2023-11-24 - Updated documentation.
Line 45: Line 47:
  
 Find current report details [[reports:start#compliance-traces-process-perspective|here]]. Find current report details [[reports:start#compliance-traces-process-perspective|here]].
- 
  
 ===== File List ===== ===== File List =====
Line 55: Line 56:
  
 Find current report details [[reports:start#file-list|here]]. Find current report details [[reports:start#file-list|here]].
- 
  
 ===== Guidance Overview ===== ===== Guidance Overview =====
  
 +  * 2025-11-06 (Build 6180) - Internal update to API. Requires Stages V7.11.8 or later.
   * 2025-08-14 (Build 5830) - Added element parent path and workspace path to Excel output, to facilitate sorting (RC-380).   * 2025-08-14 (Build 5830) - Added element parent path and workspace path to Excel output, to facilitate sorting (RC-380).
   * 2024-10-04 - Minor updates to date/build tracking.    * 2024-10-04 - Minor updates to date/build tracking. 
Line 65: Line 66:
  
 Find current report details [[reports:start#guidance-overview|here]]. Find current report details [[reports:start#guidance-overview|here]].
- 
  
 ===== License Usage ===== ===== License Usage =====
Line 76: Line 76:
  
 Find current report details [[reports:start#license-usage|here]]. Find current report details [[reports:start#license-usage|here]].
- 
  
 ===== Local Elements ===== ===== Local Elements =====
Line 100: Line 99:
 Find current report details [[reports:start#local-elements|here]]. Find current report details [[reports:start#local-elements|here]].
  
 +===== MS Project Export with Phases =====
 +
 +  * 2025-11-06 (Build 6182) - Added workspace path to Excel cover sheet (RC-382); internal updates to API (RC-427). Requires Stages V7.11.8 or later.
 +  * 2024-10-04 (Build 5020) - Minor updates to date/build tracking. 
 +  * 2023-12-14 - Code optimization.
 +  * 2023-11-09 - Fixed issue with tab name for Excel import (RC-200).
 +  * 2023-07-06 - Improved documentation, formatting, error handling (RC-145).
 +
 +Find current report details [[reports:start#ms-project-export-with-phases|here]].
  
 ===== Process Changes ===== ===== Process Changes =====
Line 107: Line 115:
  
 Find current report details [[reports:start#process-changes|here]]. Find current report details [[reports:start#process-changes|here]].
- 
  
 ===== Process Interfaces ===== ===== Process Interfaces =====
Line 119: Line 126:
  
 Find current report details [[reports:start#process-interfaces|here]]. Find current report details [[reports:start#process-interfaces|here]].
- 
  
 ===== Process Version Usage ===== ===== Process Version Usage =====
Line 129: Line 135:
  
 Find current report details [[reports:start#process-version-usage|here]]. Find current report details [[reports:start#process-version-usage|here]].
- 
  
 ===== Project Plan Export ===== ===== Project Plan Export =====
Line 138: Line 143:
  
 Find current report details [[reports:start#project-plan-export|here]]. Find current report details [[reports:start#project-plan-export|here]].
- 
  
 ===== MS Project Export with Phases ===== ===== MS Project Export with Phases =====
Line 149: Line 153:
 Find current report details [[reports:start#ms-project-export-with-phases|here]]. Find current report details [[reports:start#ms-project-export-with-phases|here]].
  
 +===== Role User Assignment =====
  
-===== Role User Assignments ===== +  * 2025-11-06 (Build 6181) - Added element path, and for Excel output, full workspace path (RC-387). Internal update for API (RC-426). Requires Stages V7.11.8 or later. 
- +  * 2024-11-08 (Build 5109) - Added support to show Team assignments for users, based on user-to-Role and Role-to-Team assignments (RC-300).
-  * 2024-11-08 - Added support to show Team assignments for users, based on user-to-Role and Role-to-Team assignments (RC-300).+
   * 2024-10-04 - Minor changes to date/build tracking.   * 2024-10-04 - Minor changes to date/build tracking.
   * 2023-06-22 - Improved documentation, formatting, error handling (RC-150).   * 2023-06-22 - Improved documentation, formatting, error handling (RC-150).
Line 169: Line 173:
  
 Find current report details [[reports:start#tailoring-report|here]]. Find current report details [[reports:start#tailoring-report|here]].
- 
  
 ===== Tailoring Statistics ===== ===== Tailoring Statistics =====
  
-  * 2024-05-09 - Minor updates to date/build tracking (RC-248).+  * 2025-10-17 (Build 6118) - Added workspace path to Excel cover sheet (RC-389). 
 +  * 2024-05-09 (Build 4618) - Minor updates to date/build tracking (RC-248).
   * 2024-04-24 - Removed Sub-workspaces parameter to avoid confusing results (RC-241); confirmed behavior for sub-workflows re-added due to child elements (RC-230); completed formatting changes (RC-153).   * 2024-04-24 - Removed Sub-workspaces parameter to avoid confusing results (RC-241); confirmed behavior for sub-workflows re-added due to child elements (RC-230); completed formatting changes (RC-153).
   * 2023-11-28 - Improved documentation, formatting, error handling (RC-153).   * 2023-11-28 - Improved documentation, formatting, error handling (RC-153).
  
 Find current report details [[reports:start#tailoring-statistics|here]]. Find current report details [[reports:start#tailoring-statistics|here]].
- 
  
 ===== Unresolved Process Interfaces ===== ===== Unresolved Process Interfaces =====
  
-  * 2024-11-06 - Changed association labels for Assembly-Work Products (RC-240). (7.11). //Applies only to report version for Stages 7.11 and later.//+  * 2025-11-26 (Build 6268) - Updated description to reflect latest changes (RC-444). 
 +  * 2025-11-06 (Build 6167) - Added columns indicating which process has or has not released the interface (RC-444). For Excel, added fully-qualified workspace name to cover sheet, and element path information to results (RC-390). Internal API updates (RC-436). Requires Stages V7.11.8 or later. 
 +  * 2024-11-06 - Changed association labels for Assembly-Work Products (RC-240). Requires Stages V7.11 or later.
   * 2024-09-16 - Adopt new API for efficiency (RC-234); update Team-Role handling to address Lead association (RC-250).   * 2024-09-16 - Adopt new API for efficiency (RC-234); update Team-Role handling to address Lead association (RC-250).
   * 2023-07-06 - Improved documentation, formatting, error handling (RC-150, RC-154).   * 2023-07-06 - Improved documentation, formatting, error handling (RC-150, RC-154).
Line 191: Line 196:
 ===== Work Product RASIC ===== ===== Work Product RASIC =====
  
-  * 2024-08-30 - Minor internal changes. +  * 2025-11-04 (Build 6167) - Added parent paths for Work Products and Roles and workspace paths for Roles (RC-391). 
 +  * 2024-08-30 (Build 4904) - Minor internal changes. 
   * 2024-05-10 - Addressed issue with error message not displaying (RC-252); minor update to date/build tracking.   * 2024-05-10 - Addressed issue with error message not displaying (RC-252); minor update to date/build tracking.
   * 2023-09-29 - Improved documentation, formatting, error handling (RC-192).   * 2023-09-29 - Improved documentation, formatting, error handling (RC-192).