Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
reports:change-history [2025/11/20 20:16] – [Guidance Overview] Fryer, Kathrynreports:change-history [2026/03/02 19:37] (current) – [Local Elements] Fryer, Kathryn
Line 1: Line 1:
 ====== Change History for Stages Standard Reports ====== ====== Change History for Stages Standard Reports ======
  
-The Stages Standard Reports are maintained and updated to support Stages versions and to deliver enhancements and fixes. Stages upgrades do not automatically update the reports; you can download the latest reports from the [[reports:start|Stages Standard Reports page]]. This page summarizes recent changes made to the reports.+The Stages Standard Reports are maintained and updated to support Stages versions and to deliver enhancements and fixes.  Where possible, changes reference internal ticket identifiers, for use by UL consultants. 
 + 
 +Stages upgrades do not automatically update the reports; you can download the latest reports from the [[reports:start|Stages Standard Reports page]]. This page summarizes recent changes made to the reports. 
  
 ===== Association Overview ===== ===== Association Overview =====
  
 +  * 2025-12-19 (Build 6358) - Enable Excel export in case where element type contains special characters not supported by Excel sheet names (RC-419). 
   * 2025-11-06 (Build 6179) - Add handling for Topic element type (RC-443); internal API update (RC-424). Requires Stages V7.11.8 or later.   * 2025-11-06 (Build 6179) - Add handling for Topic element type (RC-443); internal API update (RC-424). Requires Stages V7.11.8 or later.
   * 2025-07-01 (Build 5672)- Completely redesigned to use tables. Enabled HTML and PDF output as well as Excel. Eliminated limit on number of elements. Included details on target element workspace. In Excel, included element and workspace path information (RC-213). Requires Stages V7.11.5 or later.   * 2025-07-01 (Build 5672)- Completely redesigned to use tables. Enabled HTML and PDF output as well as Excel. Eliminated limit on number of elements. Included details on target element workspace. In Excel, included element and workspace path information (RC-213). Requires Stages V7.11.5 or later.
Line 20: Line 24:
 ===== Comments Analysis ===== ===== Comments Analysis =====
  
 +  * 2025-12-09 (Build 6315) - Fixed error that prevented running report from top-level workspace (RC-463).
   * 2025-09-15 (Build 6014) - Added element parent path in Excel output; added workspace name and path when subworkspaces are selected in all output formats (RC-378).   * 2025-09-15 (Build 6014) - Added element parent path in Excel output; added workspace name and path when subworkspaces are selected in all output formats (RC-378).
   * 2024-10-28 (Build 5094) - Added error message when running against no-process workspace.    * 2024-10-28 (Build 5094) - Added error message when running against no-process workspace. 
Line 38: Line 43:
  
 Find current report details [[reports:start#compliance-overview|here]]. Find current report details [[reports:start#compliance-overview|here]].
- 
  
 ===== Compliance Traces - Process Perspective ===== ===== Compliance Traces - Process Perspective =====
Line 50: Line 54:
  
 Find current report details [[reports:start#compliance-traces-process-perspective|here]]. Find current report details [[reports:start#compliance-traces-process-perspective|here]].
- 
  
 ===== File List ===== ===== File List =====
Line 60: Line 63:
  
 Find current report details [[reports:start#file-list|here]]. Find current report details [[reports:start#file-list|here]].
- 
  
 ===== Guidance Overview ===== ===== Guidance Overview =====
Line 71: Line 73:
  
 Find current report details [[reports:start#guidance-overview|here]]. Find current report details [[reports:start#guidance-overview|here]].
- 
  
 ===== License Usage ===== ===== License Usage =====
Line 82: Line 83:
  
 Find current report details [[reports:start#license-usage|here]]. Find current report details [[reports:start#license-usage|here]].
- 
  
 ===== Local Elements ===== ===== Local Elements =====
Line 88: Line 88:
 For latest version of report: For latest version of report:
  
 +  * 2026-01-15 (Build: 6378) - Changed order of columns and sort order for locally-created associations to improve readability (RC-428).
   * 2025-11-06 (Build: 6176) - For locally-created associations to other workspaces, provide target workspace path (RC-392).   * 2025-11-06 (Build: 6176) - For locally-created associations to other workspaces, provide target workspace path (RC-392).
   * 2025-09-12 (Build: 6009) - Add element parent path, target workspace and workspace path for Excel output (RC-381).   * 2025-09-12 (Build: 6009) - Add element parent path, target workspace and workspace path for Excel output (RC-381).
Line 106: Line 107:
 Find current report details [[reports:start#local-elements|here]]. Find current report details [[reports:start#local-elements|here]].
  
 +
 +===== MS Project Export with Phases =====
 +
 +  * 2025-11-06 (Build 6182) - Added workspace path to Excel cover sheet (RC-382); internal updates to API (RC-427). Requires Stages V7.11.8 or later.
 +  * 2024-10-04 (Build 5020) - Minor updates to date/build tracking. 
 +  * 2023-12-14 - Code optimization.
 +  * 2023-11-09 - Fixed issue with tab name for Excel import (RC-200).
 +  * 2023-07-06 - Improved documentation, formatting, error handling (RC-145).
 +
 +Find current report details [[reports:start#ms-project-export-with-phases|here]].
  
 ===== Process Changes ===== ===== Process Changes =====
Line 113: Line 124:
  
 Find current report details [[reports:start#process-changes|here]]. Find current report details [[reports:start#process-changes|here]].
- 
  
 ===== Process Interfaces ===== ===== Process Interfaces =====
Line 125: Line 135:
  
 Find current report details [[reports:start#process-interfaces|here]]. Find current report details [[reports:start#process-interfaces|here]].
- 
  
 ===== Process Version Usage ===== ===== Process Version Usage =====
Line 135: Line 144:
  
 Find current report details [[reports:start#process-version-usage|here]]. Find current report details [[reports:start#process-version-usage|here]].
- 
  
 ===== Project Plan Export ===== ===== Project Plan Export =====
  
 +  * 2026-01-13 (Build: 6375) - Changed sort order to match order in navigation panel (RC-262); updated work products to include states (RC-467).
   * 2025-11-20 (Build 6233) - Added workspace path to Excel cover sheet (RC-386).   * 2025-11-20 (Build 6233) - Added workspace path to Excel cover sheet (RC-386).
   * 2025-04-18 (Build 5543) - Code optimization (RC-356).   * 2025-04-18 (Build 5543) - Code optimization (RC-356).
Line 155: Line 164:
 Find current report details [[reports:start#ms-project-export-with-phases|here]]. Find current report details [[reports:start#ms-project-export-with-phases|here]].
  
 +===== Role User Assignment =====
  
-===== Role User Assignments ===== +  * 2025-11-06 (Build 6181) - Added element path, and for Excel output, full workspace path (RC-387). Internal update for API (RC-426). Requires Stages V7.11.8 or later. 
- +  * 2024-11-08 (Build 5109) - Added support to show Team assignments for users, based on user-to-Role and Role-to-Team assignments (RC-300).
-  * 2024-11-08 - Added support to show Team assignments for users, based on user-to-Role and Role-to-Team assignments (RC-300).+
   * 2024-10-04 - Minor changes to date/build tracking.   * 2024-10-04 - Minor changes to date/build tracking.
   * 2023-06-22 - Improved documentation, formatting, error handling (RC-150).   * 2023-06-22 - Improved documentation, formatting, error handling (RC-150).
Line 175: Line 184:
  
 Find current report details [[reports:start#tailoring-report|here]]. Find current report details [[reports:start#tailoring-report|here]].
- 
  
 ===== Tailoring Statistics ===== ===== Tailoring Statistics =====
  
 +  * 2026-02-03 (Build 6414) - Enabled run against version other than Valid or Working (RC-465); fixed issue related to failure if dependent elements in custom metamodel (RC-466).
   * 2025-10-17 (Build 6118) - Added workspace path to Excel cover sheet (RC-389).   * 2025-10-17 (Build 6118) - Added workspace path to Excel cover sheet (RC-389).
   * 2024-05-09 (Build 4618) - Minor updates to date/build tracking (RC-248).   * 2024-05-09 (Build 4618) - Minor updates to date/build tracking (RC-248).
Line 189: Line 198:
 ===== Unresolved Process Interfaces ===== ===== Unresolved Process Interfaces =====
  
-  * 2024-11-06 - Changed association labels for Assembly-Work Products (RC-240). (7.11). //Applies only to report version for Stages 7.11 and later.//+  * 2025-11-26 (Build 6268) - Updated description to reflect latest changes (RC-444). 
 +  * 2025-11-06 (Build 6167) - Added columns indicating which process has or has not released the interface (RC-444). For Excel, added fully-qualified workspace name to cover sheet, and element path information to results (RC-390). Internal API updates (RC-436). Requires Stages V7.11.8 or later. 
 +  * 2024-11-06 - Changed association labels for Assembly-Work Products (RC-240). Requires Stages V7.11 or later.
   * 2024-09-16 - Adopt new API for efficiency (RC-234); update Team-Role handling to address Lead association (RC-250).   * 2024-09-16 - Adopt new API for efficiency (RC-234); update Team-Role handling to address Lead association (RC-250).
   * 2023-07-06 - Improved documentation, formatting, error handling (RC-150, RC-154).   * 2023-07-06 - Improved documentation, formatting, error handling (RC-150, RC-154).