Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
reports:change-history [2025/11/20 20:29] Fryer, Kathrynreports:change-history [2026/01/05 17:43] (current) – [Association Overview] Fryer, Kathryn
Line 1: Line 1:
 ====== Change History for Stages Standard Reports ====== ====== Change History for Stages Standard Reports ======
  
-The Stages Standard Reports are maintained and updated to support Stages versions and to deliver enhancements and fixes. Stages upgrades do not automatically update the reports; you can download the latest reports from the [[reports:start|Stages Standard Reports page]]. This page summarizes recent changes made to the reports.+The Stages Standard Reports are maintained and updated to support Stages versions and to deliver enhancements and fixes.  Where possible, changes reference internal ticket identifiers, for use by UL consultants. 
 + 
 +Stages upgrades do not automatically update the reports; you can download the latest reports from the [[reports:start|Stages Standard Reports page]]. This page summarizes recent changes made to the reports. 
  
 ===== Association Overview ===== ===== Association Overview =====
  
 +  * 2025-12-19 (Build 6358) - Enable Excel export in case where element type contains special characters not supported by Excel sheet names (RC-419). 
   * 2025-11-06 (Build 6179) - Add handling for Topic element type (RC-443); internal API update (RC-424). Requires Stages V7.11.8 or later.   * 2025-11-06 (Build 6179) - Add handling for Topic element type (RC-443); internal API update (RC-424). Requires Stages V7.11.8 or later.
   * 2025-07-01 (Build 5672)- Completely redesigned to use tables. Enabled HTML and PDF output as well as Excel. Eliminated limit on number of elements. Included details on target element workspace. In Excel, included element and workspace path information (RC-213). Requires Stages V7.11.5 or later.   * 2025-07-01 (Build 5672)- Completely redesigned to use tables. Enabled HTML and PDF output as well as Excel. Eliminated limit on number of elements. Included details on target element workspace. In Excel, included element and workspace path information (RC-213). Requires Stages V7.11.5 or later.
Line 16: Line 20:
  
 Find current report details [[reports:start#association-overview|here]]. Find current report details [[reports:start#association-overview|here]].
 +
  
 ===== Comments Analysis ===== ===== Comments Analysis =====
  
 +  * 2025-12-09 (Build 6315) - Fixed error that prevented running report from top-level workspace (RC-463).
   * 2025-09-15 (Build 6014) - Added element parent path in Excel output; added workspace name and path when subworkspaces are selected in all output formats (RC-378).   * 2025-09-15 (Build 6014) - Added element parent path in Excel output; added workspace name and path when subworkspaces are selected in all output formats (RC-378).
   * 2024-10-28 (Build 5094) - Added error message when running against no-process workspace.    * 2024-10-28 (Build 5094) - Added error message when running against no-process workspace. 
Line 25: Line 31:
  
 Find current report details [[reports:start#comments-analysis|here]]. Find current report details [[reports:start#comments-analysis|here]].
 +
  
 ===== Compliance Overview ===== ===== Compliance Overview =====
Line 153: Line 160:
 Find current report details [[reports:start#ms-project-export-with-phases|here]]. Find current report details [[reports:start#ms-project-export-with-phases|here]].
  
-===== Role User Assignments =====+===== Role User Assignment =====
  
-  * 2024-11-08 - Added support to show Team assignments for users, based on user-to-Role and Role-to-Team assignments (RC-300).+  * 2025-11-06 (Build 6181) - Added element path, and for Excel output, full workspace path (RC-387). Internal update for API (RC-426). Requires Stages V7.11.8 or later. 
 +  * 2024-11-08 (Build 5109) - Added support to show Team assignments for users, based on user-to-Role and Role-to-Team assignments (RC-300).
   * 2024-10-04 - Minor changes to date/build tracking.   * 2024-10-04 - Minor changes to date/build tracking.
   * 2023-06-22 - Improved documentation, formatting, error handling (RC-150).   * 2023-06-22 - Improved documentation, formatting, error handling (RC-150).
  
 Find current report details [[reports:start#role-user-assignments|here]]. Find current report details [[reports:start#role-user-assignments|here]].
 +
  
 ===== Tailoring Report ===== ===== Tailoring Report =====
Line 183: Line 192:
 ===== Unresolved Process Interfaces ===== ===== Unresolved Process Interfaces =====
  
-  * 2024-11-06 - Changed association labels for Assembly-Work Products (RC-240). (7.11). //Applies only to report version for Stages 7.11 and later.//+  * 2025-11-26 (Build 6268) - Updated description to reflect latest changes (RC-444). 
 +  * 2025-11-06 (Build 6167) - Added columns indicating which process has or has not released the interface (RC-444). For Excel, added fully-qualified workspace name to cover sheet, and element path information to results (RC-390). Internal API updates (RC-436). Requires Stages V7.11.8 or later. 
 +  * 2024-11-06 - Changed association labels for Assembly-Work Products (RC-240). Requires Stages V7.11 or later.
   * 2024-09-16 - Adopt new API for efficiency (RC-234); update Team-Role handling to address Lead association (RC-250).   * 2024-09-16 - Adopt new API for efficiency (RC-234); update Team-Role handling to address Lead association (RC-250).
   * 2023-07-06 - Improved documentation, formatting, error handling (RC-150, RC-154).   * 2023-07-06 - Improved documentation, formatting, error handling (RC-150, RC-154).
  
 Find current report details [[reports:start#unresolved-process-interfaces|here]]. Find current report details [[reports:start#unresolved-process-interfaces|here]].
 +
  
 ===== Work Product RASIC ===== ===== Work Product RASIC =====