Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
reports:change-history [2025/11/26 15:12] – [Unresolved Process Interfaces] Fryer, Kathrynreports:change-history [2026/04/16 20:12] (current) – [Running Process Release Automations] Fryer, Kathryn
Line 1: Line 1:
 ====== Change History for Stages Standard Reports ====== ====== Change History for Stages Standard Reports ======
  
-The Stages Standard Reports are maintained and updated to support Stages versions and to deliver enhancements and fixes. Stages upgrades do not automatically update the reports; you can download the latest reports from the [[reports:start|Stages Standard Reports page]]. This page summarizes recent changes made to the reports.+The Stages Standard Reports are maintained and updated to support Stages versions and to deliver enhancements and fixes.  Where possible, changes reference internal ticket identifiers, for use by UL consultants. 
 + 
 +Stages upgrades do not automatically update the reports; you can download the latest reports from the [[reports:start|Stages Standard Reports page]]. This page summarizes recent changes made to the reports.
  
 ===== Association Overview ===== ===== Association Overview =====
  
 +  * 2026-04-08 (Build 6594) - On main tabs, show elements that are missing associations to the target element type; final tab shows only elements with no associations to any target type (RC-478).  
 +  * 2025-12-19 (Build 6358) - Enable Excel export in case where element type contains special characters not supported by Excel sheet names (RC-419). 
   * 2025-11-06 (Build 6179) - Add handling for Topic element type (RC-443); internal API update (RC-424). Requires Stages V7.11.8 or later.   * 2025-11-06 (Build 6179) - Add handling for Topic element type (RC-443); internal API update (RC-424). Requires Stages V7.11.8 or later.
   * 2025-07-01 (Build 5672)- Completely redesigned to use tables. Enabled HTML and PDF output as well as Excel. Eliminated limit on number of elements. Included details on target element workspace. In Excel, included element and workspace path information (RC-213). Requires Stages V7.11.5 or later.   * 2025-07-01 (Build 5672)- Completely redesigned to use tables. Enabled HTML and PDF output as well as Excel. Eliminated limit on number of elements. Included details on target element workspace. In Excel, included element and workspace path information (RC-213). Requires Stages V7.11.5 or later.
Line 19: Line 23:
 ===== Comments Analysis ===== ===== Comments Analysis =====
  
 +  * 2025-12-09 (Build 6315) - Fixed error that prevented running report from top-level workspace (RC-463).
   * 2025-09-15 (Build 6014) - Added element parent path in Excel output; added workspace name and path when subworkspaces are selected in all output formats (RC-378).   * 2025-09-15 (Build 6014) - Added element parent path in Excel output; added workspace name and path when subworkspaces are selected in all output formats (RC-378).
   * 2024-10-28 (Build 5094) - Added error message when running against no-process workspace.    * 2024-10-28 (Build 5094) - Added error message when running against no-process workspace. 
Line 28: Line 33:
 ===== Compliance Overview ===== ===== Compliance Overview =====
  
 +  * 2026-04-02 (Build: 6578) - Adapted to ensure correct counts in modules and integrated processes in Stages 26.1 (RC-507).
   * 2025-11-19 (Build 6227) - Added workspace path to header and Excel cover page (RC-377).   * 2025-11-19 (Build 6227) - Added workspace path to header and Excel cover page (RC-377).
   * 2024-10-28 - Updated for Stages 7.11 reporting changes (RC-278). Minor updates to date/build tracking.   * 2024-10-28 - Updated for Stages 7.11 reporting changes (RC-278). Minor updates to date/build tracking.
Line 39: Line 45:
 ===== Compliance Traces - Process Perspective ===== ===== Compliance Traces - Process Perspective =====
  
 +  * 2026-02-09 (Build: 6422) - Always show Note on rating (RC-512).
   * 2025-11-10 (Build 6195) - Internal update to API (RC-437). Requires Stages V7.11.8 or later.   * 2025-11-10 (Build 6195) - Internal update to API (RC-437). Requires Stages V7.11.8 or later.
   * 2025-09-12 (Build 6008) - Internal updates to handle legacy element types (RC-369); added element paths to Excel output for filtering (RC-367).    * 2025-09-12 (Build 6008) - Internal updates to handle legacy element types (RC-369); added element paths to Excel output for filtering (RC-367). 
Line 81: Line 88:
 For latest version of report: For latest version of report:
  
 +  * 2026-01-15 (Build: 6378) - Changed order of columns and sort order for locally-created associations to improve readability (RC-428).
   * 2025-11-06 (Build: 6176) - For locally-created associations to other workspaces, provide target workspace path (RC-392).   * 2025-11-06 (Build: 6176) - For locally-created associations to other workspaces, provide target workspace path (RC-392).
   * 2025-09-12 (Build: 6009) - Add element parent path, target workspace and workspace path for Excel output (RC-381).   * 2025-09-12 (Build: 6009) - Add element parent path, target workspace and workspace path for Excel output (RC-381).
Line 111: Line 119:
 ===== Process Changes ===== ===== Process Changes =====
  
 +  * 2026-03-03 (Build:6478) - Removed hidden credentials in report code (RC-484). 
   * 2025-11-20 (Build 6229) - Added full workspace path when run with subworkspaces, and in Excel cover sheet (RC-383).    * 2025-11-20 (Build 6229) - Added full workspace path when run with subworkspaces, and in Excel cover sheet (RC-383). 
   * 2023-11-23 (Build 4998) - Improved documentation, error messages, formatting; added parameter to include sub-workspaces (RC-146).   * 2023-11-23 (Build 4998) - Improved documentation, error messages, formatting; added parameter to include sub-workspaces (RC-146).
Line 138: Line 147:
 ===== Project Plan Export ===== ===== Project Plan Export =====
  
 +  * 2026-01-13 (Build: 6375) - Changed sort order to match order in navigation panel (RC-262); updated work products to include states (RC-467).
   * 2025-11-20 (Build 6233) - Added workspace path to Excel cover sheet (RC-386).   * 2025-11-20 (Build 6233) - Added workspace path to Excel cover sheet (RC-386).
   * 2025-04-18 (Build 5543) - Code optimization (RC-356).   * 2025-04-18 (Build 5543) - Code optimization (RC-356).
Line 162: Line 172:
 Find current report details [[reports:start#role-user-assignments|here]]. Find current report details [[reports:start#role-user-assignments|here]].
  
 +===== Running Process Release Automations =====
 +
 +  * 2026-04-16 (Build:6653) - Initial release, to support upgrade to Stages 26.1.
 +
 +Find current report details [[reports:start#running-process-release-automations|here]].
  
 ===== Tailoring Report ===== ===== Tailoring Report =====
Line 176: Line 191:
 ===== Tailoring Statistics ===== ===== Tailoring Statistics =====
  
 +  * 2026-04-02 (Build: 6577) - Internal change to handle folders consistently in different Stages versions (RC-501).
 +  * 2026-02-03 (Build 6414) - Enabled run against version other than Valid or Working (RC-465); fixed issue related to failure if dependent elements in custom metamodel (RC-466).
   * 2025-10-17 (Build 6118) - Added workspace path to Excel cover sheet (RC-389).   * 2025-10-17 (Build 6118) - Added workspace path to Excel cover sheet (RC-389).
   * 2024-05-09 (Build 4618) - Minor updates to date/build tracking (RC-248).   * 2024-05-09 (Build 4618) - Minor updates to date/build tracking (RC-248).
Line 192: Line 209:
  
 Find current report details [[reports:start#unresolved-process-interfaces|here]]. Find current report details [[reports:start#unresolved-process-interfaces|here]].
- 
  
 ===== Work Product RASIC ===== ===== Work Product RASIC =====
  
 +  * 2026-04-01 (Build:6576) - Internal changes for consistency across Stages versions (RC-514).
   * 2025-11-04 (Build 6167) - Added parent paths for Work Products and Roles and workspace paths for Roles (RC-391).   * 2025-11-04 (Build 6167) - Added parent paths for Work Products and Roles and workspace paths for Roles (RC-391).
   * 2024-08-30 (Build 4904) - Minor internal changes.    * 2024-08-30 (Build 4904) - Minor internal changes. 
Line 202: Line 219:
  
 Find current report details [[reports:start#work-product-rasic|here]]. Find current report details [[reports:start#work-product-rasic|here]].
 +
 +===== Workspace Groups and Common Elements =====
 +
 +  * 2026-04-10 (Build: 6624) - Initial release to support upgrade to Stages 26.1.
 +
 +Find current report details [[reports:start#workspace-group-and-common-elements|here]].