Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
reports:change-history [2025/12/10 15:39] – [Comments Analysis] Fryer, Kathrynreports:change-history [2026/03/02 19:37] (current) – [Local Elements] Fryer, Kathryn
Line 1: Line 1:
 ====== Change History for Stages Standard Reports ====== ====== Change History for Stages Standard Reports ======
  
-The Stages Standard Reports are maintained and updated to support Stages versions and to deliver enhancements and fixes. Stages upgrades do not automatically update the reports; you can download the latest reports from the [[reports:start|Stages Standard Reports page]]. This page summarizes recent changes made to the reports.+The Stages Standard Reports are maintained and updated to support Stages versions and to deliver enhancements and fixes.  Where possible, changes reference internal ticket identifiers, for use by UL consultants. 
 + 
 +Stages upgrades do not automatically update the reports; you can download the latest reports from the [[reports:start|Stages Standard Reports page]]. This page summarizes recent changes made to the reports. 
  
 ===== Association Overview ===== ===== Association Overview =====
  
 +  * 2025-12-19 (Build 6358) - Enable Excel export in case where element type contains special characters not supported by Excel sheet names (RC-419). 
   * 2025-11-06 (Build 6179) - Add handling for Topic element type (RC-443); internal API update (RC-424). Requires Stages V7.11.8 or later.   * 2025-11-06 (Build 6179) - Add handling for Topic element type (RC-443); internal API update (RC-424). Requires Stages V7.11.8 or later.
   * 2025-07-01 (Build 5672)- Completely redesigned to use tables. Enabled HTML and PDF output as well as Excel. Eliminated limit on number of elements. Included details on target element workspace. In Excel, included element and workspace path information (RC-213). Requires Stages V7.11.5 or later.   * 2025-07-01 (Build 5672)- Completely redesigned to use tables. Enabled HTML and PDF output as well as Excel. Eliminated limit on number of elements. Included details on target element workspace. In Excel, included element and workspace path information (RC-213). Requires Stages V7.11.5 or later.
Line 16: Line 20:
  
 Find current report details [[reports:start#association-overview|here]]. Find current report details [[reports:start#association-overview|here]].
 +
  
 ===== Comments Analysis ===== ===== Comments Analysis =====
Line 83: Line 88:
 For latest version of report: For latest version of report:
  
 +  * 2026-01-15 (Build: 6378) - Changed order of columns and sort order for locally-created associations to improve readability (RC-428).
   * 2025-11-06 (Build: 6176) - For locally-created associations to other workspaces, provide target workspace path (RC-392).   * 2025-11-06 (Build: 6176) - For locally-created associations to other workspaces, provide target workspace path (RC-392).
   * 2025-09-12 (Build: 6009) - Add element parent path, target workspace and workspace path for Excel output (RC-381).   * 2025-09-12 (Build: 6009) - Add element parent path, target workspace and workspace path for Excel output (RC-381).
Line 100: Line 106:
  
 Find current report details [[reports:start#local-elements|here]]. Find current report details [[reports:start#local-elements|here]].
 +
  
 ===== MS Project Export with Phases ===== ===== MS Project Export with Phases =====
Line 140: Line 147:
 ===== Project Plan Export ===== ===== Project Plan Export =====
  
 +  * 2026-01-13 (Build: 6375) - Changed sort order to match order in navigation panel (RC-262); updated work products to include states (RC-467).
   * 2025-11-20 (Build 6233) - Added workspace path to Excel cover sheet (RC-386).   * 2025-11-20 (Build 6233) - Added workspace path to Excel cover sheet (RC-386).
   * 2025-04-18 (Build 5543) - Code optimization (RC-356).   * 2025-04-18 (Build 5543) - Code optimization (RC-356).
Line 145: Line 153:
  
 Find current report details [[reports:start#project-plan-export|here]]. Find current report details [[reports:start#project-plan-export|here]].
 +
  
 ===== MS Project Export with Phases ===== ===== MS Project Export with Phases =====
Line 178: Line 187:
 ===== Tailoring Statistics ===== ===== Tailoring Statistics =====
  
 +  * 2026-02-03 (Build 6414) - Enabled run against version other than Valid or Working (RC-465); fixed issue related to failure if dependent elements in custom metamodel (RC-466).
   * 2025-10-17 (Build 6118) - Added workspace path to Excel cover sheet (RC-389).   * 2025-10-17 (Build 6118) - Added workspace path to Excel cover sheet (RC-389).
   * 2024-05-09 (Build 4618) - Minor updates to date/build tracking (RC-248).   * 2024-05-09 (Build 4618) - Minor updates to date/build tracking (RC-248).
Line 184: Line 194:
  
 Find current report details [[reports:start#tailoring-statistics|here]]. Find current report details [[reports:start#tailoring-statistics|here]].
 +
  
 ===== Unresolved Process Interfaces ===== ===== Unresolved Process Interfaces =====