Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
72:model [2018/08/21 01:56] – [Model a Process] bkkr72:model [2018/08/21 02:01] – [Model a Process] bkkr
Line 26: Line 26:
  
 Work products can be added to activities in this method also. (See below) Work products can be added to activities in this method also. (See below)
 +
 +{{:72:717c4233d2dab5473809de28d4e33b7c.png}}
  
 {{:72:c05402ed7e786093529dac46d0f417f3.png}} {{:72:c05402ed7e786093529dac46d0f417f3.png}}
Line 44: Line 46:
       - From here you can create inputs or outputs of the activity. Select "Add Inputs" or "Add Outputs" next. Clicking either of them allows you to type the name of the input/output or to browse other inputs/outputs. When typing the name, the drop down menu comes up with other inputs/outputs from your workspace, an option to "Create", and "Create comment". Select "Create" after typing in the name of your input/output. As soon as the input/output is created, it will show up on the flowchart or table.       - From here you can create inputs or outputs of the activity. Select "Add Inputs" or "Add Outputs" next. Clicking either of them allows you to type the name of the input/output or to browse other inputs/outputs. When typing the name, the drop down menu comes up with other inputs/outputs from your workspace, an option to "Create", and "Create comment". Select "Create" after typing in the name of your input/output. As soon as the input/output is created, it will show up on the flowchart or table.
  
-GIF OF THE METHOD+{{:72:130c89ed3361367d61587f1c0b4b8be4.png}}{{:72:3d088205965aba34e2167879c85a7607.png}}
  
 === Roles === === Roles ===