Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionLast revisionBoth sides next revision | ||
77:releasenotes [2021/07/14 22:49] – emr | 77:releasenotes [2021/10/12 17:30] – emr | ||
---|---|---|---|
Line 45: | Line 45: | ||
Before version 7.7, interfaces were shown between process versions with the same name. This capability has been removed. | Before version 7.7, interfaces were shown between process versions with the same name. This capability has been removed. | ||
- | ===== Scheduled | + | ===== Scheduled |
Some process changes should be made effective at a specific date, e.g. at the first day of a month. With Stages 7.7, the release automations can be configured so reviewers and/or approvers can set a specific date and time when the process will be released and marked as valid. | Some process changes should be made effective at a specific date, e.g. at the first day of a month. With Stages 7.7, the release automations can be configured so reviewers and/or approvers can set a specific date and time when the process will be released and marked as valid. | ||
Line 55: | Line 55: | ||
[[https:// | [[https:// | ||
- | ===== Value streams | + | ===== Value Streams |
- | The value stream mapping capabilities that have been introduced in previous releases are now available in each new Stages | + | Value streams are a method to manage cross-functional and cross-organizational activities and provide macro views of a process landscape. |
+ | |||
+ | The value stream mapping capabilities that have been introduced in previous | ||
[[https:// | [[https:// | ||
Line 63: | Line 65: | ||
If you have a customized metamodel version, please contact your respective product consultants for more info. | If you have a customized metamodel version, please contact your respective product consultants for more info. | ||
- | ===== Compliance | + | ===== Compliance |
A new report has been added that can be run from a reference model workspace to provide an overview of all mappings and coverage across all workspaces where that reference model has been mapped. | A new report has been added that can be run from a reference model workspace to provide an overview of all mappings and coverage across all workspaces where that reference model has been mapped. | ||
Line 71: | Line 73: | ||
As the report shows both the coverage and the number of mappings for a particular standard requirement, | As the report shows both the coverage and the number of mappings for a particular standard requirement, | ||
- | If you are upgrading from a previous version, you can {{:77:complianceoverview.rptdesign|download the report here}}. | + | If you are upgrading from a previous version, you can [[:reports:start# |
===== Process Feedback in Codebeamer ===== | ===== Process Feedback in Codebeamer ===== | ||
Line 111: | Line 113: | ||
</ | </ | ||
- | ===== Support for feedback issue collectors | + | ===== Support for Feedback Issue Collectors |
We added the new [[: | We added the new [[: | ||
Line 127: | Line 129: | ||
* The access to PDF exports can now be controlled via its own security domain. While upgrading to version 7.7, all users with process read permissions are automatically given this new permission. | * The access to PDF exports can now be controlled via its own security domain. While upgrading to version 7.7, all users with process read permissions are automatically given this new permission. | ||
* The Y scales in the user activity statistics under '' | * The Y scales in the user activity statistics under '' | ||
+ | * The " | ||
===== End of Life for CMMI in Stages ===== | ===== End of Life for CMMI in Stages ===== | ||
Line 138: | Line 141: | ||
===== How to Upgrade to Version 7.7 ===== | ===== How to Upgrade to Version 7.7 ===== | ||
- | Please [[stages-support@methodpark.com? | + | Please [[stages-support@methodpark.com? |
===== Notes ===== | ===== Notes ===== |