Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
reports:start [2020/05/20 10:41] sahrreports:start [2021/05/28 13:46] – [Project Plan Export] hodr
Line 73: Line 73:
 <font 10px/inherit;;inherit;;inherit>Available since: Stages V7.1</font> <font 10px/inherit;;inherit;;inherit>Available since: Stages V7.1</font>
  
-<font 10px/inherit;;inherit;;inherit>Last update: Stages V7.5</font>+<font 10px/inherit;;inherit;;inherit>Last update: Stages V7.5 (2020-06-10)</font>
  
 ===== Local Elements ===== ===== Local Elements =====
  
-This report lists all local or overlayed elements, as well as locally created associations for the current version of the workspace.+This report lists all local or overlayed elements, as well as locally created associations for the working version of the workspace.
  
 **Purpose**: Check if local adoptions were done in an integrated workspace. **Purpose**: Check if local adoptions were done in an integrated workspace.
Line 84: Line 84:
  
 <font 10px/inherit;;inherit;;inherit>Available since: Stages V7.5</font> <font 10px/inherit;;inherit;;inherit>Available since: Stages V7.5</font>
 +
 +<font 10px/inherit;;inherit;;inherit>Last update: 2021-03-24 (copied process associations were not shown as local associations)</font>
 +
  
 ===== Process Changes ===== ===== Process Changes =====
Line 116: Line 119:
 <font 10px/inherit;;inherit;;inherit>Available since: Stages V7.1</font> <font 10px/inherit;;inherit;;inherit>Available since: Stages V7.1</font>
  
-===== Project Planning Export =====+===== Project Plan Export =====
  
 This report generates data for a project plan export from the current version of the workspace. It lists all the activities of the selected processes and the related information such as predecessor of the activity, its level in the process hierarchy, duration, responsible and supporting roles, and its inputs and outputs. This report generates data for a project plan export from the current version of the workspace. It lists all the activities of the selected processes and the related information such as predecessor of the activity, its level in the process hierarchy, duration, responsible and supporting roles, and its inputs and outputs.
Line 125: Line 128:
  
 <font 10px/inherit;;inherit;;inherit>Available since: Stages V7.2</font> <font 10px/inherit;;inherit;;inherit>Available since: Stages V7.2</font>
 +
  
 ===== Project Planning Export with Phases ===== ===== Project Planning Export with Phases =====